Page views this IP this session = 1 of 10 unsubscribed pagesLynemouth Wind Farm
Click here for Generation Forecast for wind farms based on Met office data
Subscribers see an interactive map with Lynemouth Wind Farm and local projects displayed.
( Subscribe for £100 )to have full access to all Wind projects and details.
Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm
Subscribe for £500 to include full csv and KML downloads of all Wind project data.
To create a login account see: User Registration. This will allow 30 page views each session rather than 5
One subscription covers your organisation / school / university / company . NOT per user
|
Lynemouth Wind Farm (Wind , Active) Location in the UK : England, Northumberland, Wansbeck Type of installation: Wind on/offshore: on Turbines :13 Capacity : 26 MW Approx Date of 1st power generation: February 2012
Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets
Wind Turbines, Wind Farm, Renewable Energy, Green Power
/YES
Construction on the site began in October 2010 and the turbine installer Windhoist completed the mechanical and electrical installation of the 13 wind turbines in December 2011.
Located approx 2km north of Ashington, Northumberland, adjacent to the Rio Tinto Alcan Lynemouth Smelter, the windfarm will comprise of up to 13 turbines with the capacity to produce 30MW of clean green energy, enough to power over 16,000 homes.
The turbines will stand at 121m (397ft). The nearby smelter chimneys are 80m (262ft) in height while the Alcan power station stack is 114m (374ft) high.
Construction started October 2010, Turbine deliveries to site will commence in summer 2011 For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation Subscriber Register Lynemouth Windfarm Off A189 Nr Ashington NE63 9AT England
Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.
Site Name: |
Lynemouth Windfarm (Resubmission) 26 MW
|
Energy Type: |
Wind Onshore |
County: |
Northumberland Country: England LPA: DECC (S36)
|
Site ID and Reference: |
3752 / AA008
District:
|
Applicant: |
Scottish Power Renewables
Application :
CM/20060984
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
13 |
Turbine Capacity: |
2 |
Height of Turbines: |
|
Calculated capacity: |
26 |
Site Address: |
Land adjacent to Rio Tinto Alcan Smelter, Lynemouth (2km north of Ashington)
|
|
|
County: |
Northumberland Region: North East
|
OS Coordinates: |
429400 / 429400
|
Development Status: |
Operational
|
Application Submitted: |
11/20/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
5/11/2007
|
Construction Date: |
7/1/2010
|
|
|
Generator Live |
4/12/2012
|
This Record Last Updated: |
4/24/2012
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
5/11/2007 |
Site Name: |
Lynemouth Windfarm 2.4 MW
|
Energy Type: |
Wind Onshore |
County: |
Northumberland Country: England LPA: Northumberland County Council
|
Site ID and Reference: |
3255 / N00361W
District:
|
Applicant: |
Scottish Power Renewables
Application :
CM/20060877
|
(Go to search to find Application) |
For Wind Farms |
|
Number of Turbines: |
3 |
Turbine Capacity: |
0.80000000000000004 |
Height of Turbines: |
|
Calculated capacity: |
2.4 |
Site Address: |
North of Ashington
|
|
|
County: |
Northumberland Region: North East
|
OS Coordinates: |
430000 / 430000
|
Development Status: |
Revised
|
Application Submitted: |
10/13/2006
|
Planning Permission Granted |
|
Application Determined: |
|
Permission refused: |
5/30/2007
|
Construction Date: |
|
|
|
Generator Live |
|
This Record Last Updated: |
9/24/2010
|
RO Banding (ROC/MWh) |
|
FiT Tariff (p/kWh): |
|
|
--- Additional Dates where relevant ---- |
Application Withdrawn: |
|
|
|
Permission Expiration Date: |
|
|
|
Secretary of State - |
Appeal Lodged: |
|
Called In: |
|
Appeal Withdrawn: |
|
Refusal: |
|
Appeal Refused: |
|
Granted: |
|
Appeal Granted: |
5/30/2007 |
Site Name: |
Lynemouth
|
Generator Type: |
On-shore wind (RO code = RQ)
|
Scheme : |
RO
|
Generator ID: |
R00265RQEN
|
Capacity: |
26000
|
Status: |
Live
|
Accreditation Date: |
10/13/2006
|
|
|
Commission Date: |
1/19/2012
|
|
|
Applicant: |
ScottishPower Renewables (UK) Limited
|
Applicant Address: |
Arnott House
12-16 Bridge Street
Belfast
BT1 1LB
Northern Ireland
|
Address: |
Lynemouth Windfarm
Off A189
Nr Ashington
NE63 9AT
England
|
Capacity: 100 Start Speed: 5 m/s (11.185 mph) Optimum Speed: 15 m/s (33.555 mph) Stop Speed: 22 m/s (49.214 mph)
Local Weather Station: Elevation of Weather Station:
Date for Wind forecast: 5/2/2024 Wind Speed at Weather Station: mph Wind Direction: Outputratio = 0.00 Output of Wind Farm = 0.0
Project Info |
|
©2018
Simon Mallett |
Latest News Added |
Carn Nicholas Drone footage Date and Time of entry: Tuesday, March 19, 2024 00:00
Carn Nicholas Solar Park The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022. Date and Time of entry: Tuesday, March 19, 2024 00:00
Dorset Green Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy Date and Time of entry: Tuesday, March 19, 2024 00:00
Dragon LNG Meadow
Date and Time of entry: Tuesday, March 19, 2024 00:00
Pretoria rd looking towards Ellistown.Solar farm.
Date and Time of entry: Tuesday, March 19, 2024 00:00
|
|
©2017
Simon Mallett |
|